Maintenance and long-term planning

Waterproofing contractors applying torch-on membrane to a flat roof

For trustees

  • A plan you can present at the AGM
  • Clear reasons behind every priority
  • Quotes you can compare like for like

For managing agents

  • Backlogs ranked across schemes
  • Scopes ready for procurement
  • Handover records for the scheme file

The priority ladder

How we rank a backlog.

Six questions, in this order. Tap a rung to see what it means.

Clear roles on every job.

The specialist or contractor

  • Inspections and technical findings
  • Their quote and their work
  • Certificates and warranties

The scheme

  • Decisions and resolutions
  • Appointments and payment
  • Communication with owners

General guidance on reserves, levies and AGMs is educational, not legal or financial advice.

What each reader gets from maintenance and long-term planning

You are balancing safety, owner questions, a growing backlog and limited information before approving maintenance work.

You get ranked issues, evidence-led scopes, comparable options and decision records that make the chosen route explainable.

Your portfolio needs a consistent way to progress scheme defects without losing the client relationship or administration trail.

You get structured intake, coordinated capability, defined responsibilities, work programmes and close-out records for each scheme.

What you get

The deliverables, plainly.

  1. Asset and condition registerMaintainable systems, locations, evidence, condition, consequence, history and review dates organised for planning.
  2. Ranked maintenance roadmapUrgent protection, investigations, repairs and replacements sequenced by consequence, dependency, timing and decision need.
  3. Written work scopesQuestions, outcomes, access, protection, exclusions, quality checks, responsibilities and handover requirements defined clearly.
  4. Comparable procurement optionsQuotes and methods aligned by scope, assumptions, access, testing, programme, warranty and making good.
  5. Live-site coordinationWork zones, resident impact, shutdowns, interfaces, changes and phase handovers managed in one practical route.
  6. Owner decision materialPlain explanations of condition, consequence, options, funding route, timing, uncertainty and approval required.
  7. Close-out and warranty fileReports, photographs, tests, certificates, warranties, defects, manuals and future maintenance instructions retained together.

Guides on maintenance and long-term planning

Why do maintenance backlogs keep growing?A maintenance backlog grows when the scheme records symptoms but never turns them into owned, funded and sequenced decisions.5 minHow should a scheme prioritise maintenance?A scheme should rank maintenance by consequence and dependency, not by who sends the most urgent email.5 minWhat belongs in a long-term maintenance plan?A useful long-term maintenance plan connects the scheme's assets, condition, timing, likely work and funding decisions in one living record.5 minHow should trustees think about maintenance reserves?Maintenance reserves make more sense when trustees connect them to visible work, evidence, timing and uncertainty rather than treating them as an unexplained balance.5 minHow can trustees compare maintenance quotes fairly?Trustees compare maintenance quotes fairly by making the scope, access, exclusions, tests, programme and handover requirements match before looking at the price.5 minWhat should a scheme check when a roof or gutter leaks?A roof or gutter leak needs a traceable inspection of source, water path, prior repairs and access before anyone promises that a patch will last.5 minHow should a scheme investigate damp and waterproofing?Damp investigation starts with moisture evidence and building context, not with a paint colour or a promise that one coating will solve every source.5 minHow should a scheme plan painting and protective coatings?Painting works best as planned asset care when the scheme checks the substrate, repairs the cause, defines preparation and records the finish it is buying.5 minHow should trustees handle plumbing and drainage faults?Plumbing and drainage faults need a clear distinction between emergency control, source tracing, shared-system responsibility and permanent repair.5 minWhat should a scheme do about electrical and lighting faults?Electrical and lighting faults should be made safe quickly, investigated by appropriate capability and closed with evidence rather than a note saying the fitting was changed.5 minHow should trustees plan lift maintenance and repairs?Lift planning should connect service history, safety concerns, recurring faults, resident impact, specialist findings and the decision between repair and replacement.5 minWhat should a scheme consider when maintaining gates and access systems?Gate and access maintenance combines safety, reliable entry, resident communication, security records, power and mechanical condition.5 minWhat should trustees explain when considering a special levy?A special levy discussion should explain the work, evidence, timing, options, consequences and approval route without presenting an uncertain estimate as a final answer.5 minHow can a maintenance plan be presented clearly at an AGM?An AGM maintenance presentation should lead owners through condition, consequence, options, timing and the exact decision required.5 minWhat records should a scheme keep after maintenance work?A maintenance job is not properly closed when the invoice is paid; the scheme needs a usable record of what was done, tested, warranted and left open.5 minHow should a scheme decide whether to repair or replace an asset?Repair or replace is a condition, risk and whole-life decision, not a reflex based on age, frustration or the first supplier's preferred option.5 minHow can a scheme organise routine maintenance inspections?Routine inspections work when each area has a purpose, frequency, evidence standard, responsible person and escalation route.5 minHow should maintenance work be phased while residents remain on site?Live-site maintenance needs a work sequence that protects people, access, services, contents and communication while keeping every package accountable.5 minHow should a scheme communicate about maintenance with owners?Good maintenance updates tell owners what is known, what is being decided, what will happen next and where the supporting record sits.5 minHow can a scheme coordinate several maintenance jobs?Several maintenance jobs become manageable when the scheme maps dependencies, access, specialist interfaces, resident impact, approvals and handover before work starts.5 min

Questions about maintenance and long-term planning

What is a sectional title maintenance backlog?

A sectional title maintenance backlog is a set of unresolved repairs, inspections or replacements affecting shared property. It should show each asset, location, condition, consequence, evidence, owner, next action and review date. A list that only says ‘roof’ or ‘plumbing’ cannot guide approval or procurement.

Why do body corporate repairs get delayed?

Body corporate repairs get delayed when nobody has converted the complaint into a defined decision. Missing access, unclear responsibility, incomplete evidence, vague scopes and absent approval dates all create waiting. Naming the next fact, responsible role and decision point usually exposes the real block faster than sending another reminder.

What should trustees fix first in a scheme?

Trustees should first address conditions that threaten people, essential access, property or services, then legal or compliance concerns and damage that will worsen. Resident effect, timing and cost follow once the consequence is understood. Record why an item leads the queue so the priority survives a change of trustees.

How does a maintenance plan help a body corporate?

A maintenance plan helps a body corporate connect assets, condition, expected work, timing, dependencies and funding decisions. It separates routine care from investigation, repair and replacement. The plan also gives the managing agent a dated administration route and gives trustees evidence for owner conversations and approvals.

What is an asset register for a scheme?

An asset register for a scheme identifies maintainable systems and their locations, condition, history, evidence and next review. Useful entries name a roof junction, gate motor, lift, sump pump or common light rather than saying only ‘building’. Unknown information should be marked for investigation, not silently guessed.

How should trustees record a recurring defect?

Trustees should record a recurring defect with dates, locations, symptoms, weather or operating conditions, prior scopes, invoices, photographs and the action taken. Compare what returned with what the earlier work covered. Recurrence may justify a source investigation instead of another narrow patch or replacement.

What documents support maintenance planning?

Maintenance planning is supported by the levy roll where relevant to scheme records, maintenance plan, AGM and trustee minutes, inspection reports, quotations, invoices, photographs, warranties, service reports, meter readings and municipal statements. Dates and locations matter because they show whether condition changed before or after an intervention.

How can trustees rank repairs fairly?

Trustees can rank repairs fairly by applying the same questions to every item: immediate protection, legal or compliance risk, further damage, resident effect, timing, cost and repair-or-replace route. Add evidence quality and dependencies. The resulting order should include a short reason, not just a number.

What is the difference between routine and major maintenance?

Routine maintenance is recurring care or servicing that keeps an asset operating. Major maintenance is a defined repair, replacement or project requiring more preparation, procurement or funding. The categories can connect, but separating them shows owners what is ordinary administration and what needs a longer decision route.

When should a scheme inspect a roof?

A scheme should inspect a roof when leaks recur, visible deterioration appears, a warranty or seasonal review is due, or planned work depends on its condition. The inspection should state safe access, areas viewed, limitations, water paths, photographs, prior repairs and the next decision rather than promise a diagnosis from below.

How should a scheme respond to water ingress?

A scheme should respond to water ingress by protecting people and property, recording the location and conditions, checking electrical or access risks and tracing the source before permanent making good. Separate temporary protection, investigation, repair and painting. Keep prior scopes and photographs so a returning leak has a usable history.

Should a scheme repair damp before painting?

A scheme should investigate damp and its source before permanent painting. Moisture may come from drainage, plumbing, roofs, waterproofing, condensation or substrate conditions. A coating scope should include preparation and repairs, while internal making good follows evidence that the source has been addressed or is being properly monitored.

What makes a maintenance quote comparable?

A maintenance quote becomes comparable when every provider prices the same locations, outcome, access, preparation, tests, protection, exclusions, reinstatement, programme, quality checks, warranty and handover. Put responses on one sheet and mark items included, excluded, provisional or unanswered. Price alone cannot correct different scopes.

What should a roof repair quote include?

A roof repair quote should identify the affected areas, access method, preparation, repair detail, weather limits, testing or observation, protection below, waste, internal making good, exclusions and warranty. It should say what happens if inspection reveals a wider defect. A ceiling stain alone is not a sufficient scope.

How should a scheme plan painting work?

A scheme should plan painting from a condition survey that records peeling, cracks, damp, failed sealants, corrosion, biological growth and substrate repairs. The scope should define preparation, coating system, access, resident protection, colour records, programme, defects, warranty and maintenance. Painting over an unresolved source creates repeat work.

What should a damp inspection report contain?

A damp inspection report should state inspected locations, moisture patterns, dates and conditions, adjacent services, tests, access limitations, observations, likely causes, exclusions and recommended next steps. It should distinguish observed evidence from hypotheses. A product recommendation without source reasoning is not a complete investigation.

How should trustees manage a blocked drain?

Trustees should manage a blocked drain by making the area safe, recording flow, location and recurrence, checking connected gullies and discharge routes and defining the smallest useful test. Clearing may be urgent, but it does not prove the system is sound. Keep testing, reinstatement and future cleaning in the scope.

What does a lift maintenance history show?

A lift maintenance history shows service dates, call-outs, downtime, recurring faults, parts, findings, certificates, warranties and resident impact. It helps distinguish routine servicing from a repair, modernisation or replacement decision. Repeated invoices without fault patterns can conceal one unresolved condition and weaken the next approval.

When does a gate need more than a motor repair?

A gate needs more than a motor repair when track, hinges, stops, safety devices, controls, power, cabling, intercom or alignment may be contributing to failure. Test the full access sequence and record temporary arrangements. A motor that runs against a damaged track will not create reliable or safe access.

What should an electrical fault record show?

An electrical fault record should show the fitting or circuit, location, symptom, repeat pattern, water or impact context, isolation, photographs, test required and next action. A lamp change is not proof that a tripping circuit is safe. Appropriate capability should provide tests, certificates and a clear handover.

How should trustees explain a special levy for repairs?

Trustees should explain the asset, condition, evidence, urgency, alternatives, intended work, exclusions, timing, owner impact, approval route and later review. If the request funds an investigation rather than a final repair, say so. A clear work story is more trustworthy than one unexplained total or broad promise.

What belongs in an AGM maintenance report?

An AGM maintenance report should show completed work, current condition, priority risks, evidence, proposed work, options, timing, funding route, owner impact and decisions required. Use a concise summary with dated photographs and linked records. Separate confirmed findings, reported symptoms, hypotheses and deliberate deferrals.

Which maintenance handover records matter most?

The most useful maintenance handover records are the approved scope, appointment, clarifications, photographs, reports, tests, certificates, warranties, invoices, variations, defects, manuals and future-care instructions. File them against the asset with dates and a review trigger. Payment alone does not prove complete delivery.

What should a maintenance warranty say?

A maintenance warranty should identify the work or product, area, start date, duration, exclusions, maintenance conditions, response route and evidence needed for a claim. Keep it with the scope, invoice and completion record. A warranty is not a promise that every later defect will be covered.

How should a scheme decide to repair or replace?

A scheme should decide to repair or replace by comparing cause, condition, safety, recurrence, serviceability, compatibility, downtime, access, maintenance, warranty, whole-life consequence and evidence quality. Age is only a clue. If the cause is unclear, commission the smallest useful assessment before requesting final options.

How often should scheme maintenance inspections happen?

Scheme maintenance inspections should follow the asset's consequence, service requirements, season, occupancy and history rather than one interval for everything. Use route-based checks with a purpose, responsible role, evidence standard and escalation trigger. Review the rhythm when failures recur or a seasonal condition changes the risk.

How can maintenance happen while residents remain on site?

Maintenance can happen while residents remain on site when work is divided into zones with access, protection, notices, shutdowns, working hours, cleaning, testing and handover conditions. Map dependencies before starting. A phase is not complete when the contractor leaves; it is complete when the area and records are checked.

What should owners receive during maintenance work?

Owners should receive the condition or decision, approved scope, timing, access or service impact, action expected from them, contact route and next update. They do not need every technical email, but they need a reliable explanation of why work is happening and what remains uncertain.

How can a managing agent track maintenance across schemes?

A managing agent can track maintenance across schemes with a consistent intake and separate scheme records showing issue, asset, evidence, authority, scope, appointment, access, status, next date and handover. Consistency helps administration, but each body corporate's decision trail and documents must remain distinct.

What is a maintenance dependency?

A maintenance dependency is a condition where one action must happen before another can sensibly proceed. Drainage investigation may precede paving, roof repair may precede internal painting and a lift assessment may precede replacement. Mark dependencies in the programme so contractors do not price or start work in the wrong order.

How should a scheme handle several jobs at once?

A scheme should handle several jobs with a job map, defined work packages, dependency arrows, one programme, access plan, resident notices, change record and package handovers. Track planned, active, blocked, complete and defect-review states. A shared calendar without scope boundaries will not prevent rework or conflicting site access.

What is a useful maintenance decision brief?

A useful maintenance decision brief contains the scheme and authority, asset, condition, consequence, evidence, missing facts, options, recommended next action, responsibility, approval required and handover expectation. It should be short enough for a meeting while linking to reports, photographs, quotes and minutes.

How should a scheme record deferred maintenance?

A scheme should record deferred maintenance with the reason, evidence considered, responsible role, review date and trigger for reconsideration. ‘Repaint after waterproofing’ is meaningful; ‘painting postponed’ is not. Deferral is an active decision only when the scheme knows what would make it revisit the item.

What should a maintenance inspection checklist avoid?

A maintenance inspection checklist should avoid vague prompts such as ‘check building’ and technical conclusions outside the inspector's capability. It should name routes, locations, observable conditions, photographs, access limits, escalation triggers, owner and review date. A short checklist that produces action beats a long list nobody uses.

How should a scheme assess a recurring leak?

A scheme should assess a recurring leak by comparing dates, weather, locations, prior scopes, repairs, photographs, access and the route water may take. Define an inspection that tests likely sources and states limitations. Do not repaint the visible stain or repeat a patch without recording why the earlier work failed.

What is the managing agent's role in maintenance planning?

The managing agent keeps the client relationship and scheme administration, including records, access, notices, appointments and updates as agreed. The body corporate retains the approval, appointment and payment decisions. Dev 360 One can add delivery capacity and specialist coordination with written roles, while specialists remain responsible for technical findings, work, certificates and warranties.

What is the trustee's role in maintenance planning?

Trustees set priorities, review evidence, approve routes within their authority, explain decisions to owners and check that records support the scheme's plan. They should not make technical findings without appropriate capability. A good decision identifies uncertainty, scope, consequence, funding route, responsible role and next review.

How should maintenance changes be approved?

Maintenance changes should be recorded with the condition found, safety or scope effect, proposed response, authority, time or cost consequence and updated handover requirement. Do not let an informal site instruction become an untracked variation. Update resident communication and the programme when access or disruption changes.

What should a scheme do after a failed repair?

After a failed repair, a scheme should preserve the new condition, compare it with the original scope, review tests and warranty, identify what returned and decide whether a source assessment is needed. Do not assume failure proves replacement is required. The history should inform a narrower, better next decision.

How can a scheme make maintenance decisions easier for owners?

A scheme can make maintenance decisions easier for owners by showing the asset, evidence, consequence, options, scope boundaries, timing, impact, funding route and exact approval requested. Use plain labels and dated photographs. Explain what is not yet known, because owners can understand a staged decision better than false certainty.

Start with the backlog you have.

Send the open items you know about. We will tell you what looks urgent and what a proper assessment would cover.