Sectional title scheme
Recovery plan prepared
From a walk-through to a recovery plan.
A scheme carrying deficits, arrears and a maintenance backlog needed one plan its trustees could take to owners.

Corroded carport roof sheeting

Damp and staining at a wall base

Blocked drainage outlets at the paving

Service and electrical cabinets

Electric fence in poor condition

External plumbing and a leaking connection

Displaced paving and an open joint

A plant growing from a wall crack

A fire hose reel point checked for compliance
- The problem
- Financial pressure and visible maintenance issues made it difficult to decide what needed attention first.
- What we did
- The team assembled site findings and specialist input into a structured recovery plan, connecting financial and maintenance considerations.
- What it produced
- A condition and risk report, a recovery roadmap and a case for discussion.
A visible evidence base gives trustees a clearer starting point.
Where it stands: Assessment and plan prepared.

