How can trustees compare maintenance quotes fairly?

Trustees compare maintenance quotes fairly by making the scope, access, exclusions, tests, programme and handover requirements match before looking at the price.

Waterproofing contractors applying torch-on membrane to a flat roof

Key takeaways

  • A quote comparison is only fair when providers price the same defined outcome.
  • Exclusions such as scaffolding, access and reinstatement can change the real decision.
  • Technical findings and warranties remain the appointed specialist's responsibility.

Three prices do not automatically create a fair choice. If one quote includes access equipment, testing, removal, making good and a written warranty while another covers labour and materials only, the lowest number says very little. Trustees should first make the work comparable, then examine capability, assumptions, programme, quality checks and the records that will be left behind.

One quote-comparison illustration is a 40-unit scheme with water entering a basement store. One provider prices sealant at the visible crack. Another includes a drainage inspection and local waterproofing. A third includes excavation but excludes reinstatement. Those are different interventions. The scheme must decide whether it needs an assessment, a repair or a broader package before comparing figures.

Write one scope before asking for numbers

The scope should state the problem, locations, access, expected outcome, inspection or testing method, work included, exclusions, protection of occupied areas, reinstatement, waste removal, programme, site contact, quality checks and handover. Include photographs, reports, measurements and prior work where available. Ask providers to identify assumptions rather than bury them in a line at the bottom of a quote.

For the basement example, the brief might require inspection of the crack, adjacent wall and drainage path; photographs before and after; a stated repair method; protection of stored goods; water testing where suitable; removal of debris; making good; and a written warranty or maintenance instruction if offered. The scope should also say what happens if the inspection reveals a wider defect.

Read the exclusions first

Exclusions often explain the apparent price gap. Look for scaffolding, lifting equipment, traffic control, permits, isolation, testing, specialist design, removal, disposal, making good, painting, after-hours access and return visits. Ask whether the quote covers all areas shown in the brief and whether provisional items are based on measurements or guesses.

A managing agent should put the exclusions beside the price, not in a separate attachment that trustees may miss. Trustees should ask: if this item is required, who decides it, how is it priced and how could it affect the programme? A quote that is candid about uncertainty can be stronger than one that appears complete but leaves the risk hidden.

Score capability and delivery

Price is one column. Add relevant experience, capacity for the proposed period, evidence of previous work, insurance or licences where relevant, references or work samples, ability to work around residents and clarity of communication. Check who can sign, whether the provider understands the site and whether conflicts are disclosed. Do not use a generic scorecard that rewards polished paperwork while ignoring the actual risk.

Ask each provider to confirm the assumptions behind its method. A waterproofing system may depend on dry weather, substrate preparation or access that cannot be guaranteed from a desktop quote. Those conditions belong in the decision paper so the committee understands what could change after appointment.

A provider in this example should explain how it will prepare the substrate, manage moisture, protect stored goods and test the repair. A provider that only repeats ‘seal crack’ has not answered the same question. The scheme can then weigh capability against scope, programme and cost rather than choosing a number in isolation.

Make the comparison readable

Put the decision on one sheet with rows for scope, areas, method, access, exclusions, materials, testing, programme, payment milestones, defects period, warranty, insurance or compliance documents and handover. Note whether each response is included, excluded, provisional or not answered. Add a short recommendation that states the reason, unresolved question and approval needed.

Clarifications deserve the same discipline as the original request. Keep a question register showing who asked, the answer, date and whether the answer changes the scope. If a provider proposes a different material or method, record its benefit, limitation and maintenance consequence. Trustees can then choose an option knowingly rather than accept a technical variation during the job. A managing agent should also check that the person who supplied a clarification was authorised to speak for the scheme.

The agent can administer the work order and the trustees can assess the evidence. A provider must describe its technical method, results and warranty in its own documents. Our role is to make the route and records clearer, not to substitute for that specialist accountability.

Handle clarifications in the open

If one provider asks a useful question, share the answer with all providers still being considered. Keep an addendum so the comparison remains fair. Never let a private conversation quietly change the outcome or allow one quote to benefit from information others did not receive. If the brief changes materially, reissue the scope or record why a fresh comparison is unnecessary.

The One quote route can clarify the need, write a comparable brief, coordinate site information, place responses on one sheet and organise the selected route through handover. Our opinion is simple: a quote is not a scope. This week: choose one open maintenance request and highlight every line that says excluded, provisional, by others or subject to site conditions. Turn those lines into questions before the next approval.

What you get

What you get from Dev 360 One

Comparable scope
One written brief defining outcome, access, tests, exclusions, protection, reinstatement and handover.
Quote comparison sheet
Responses aligned by inclusions, exclusions, assumptions, programme, quality checks and warranty.
Capability and risk review
Relevant evidence, capacity, site constraints and unresolved questions recorded for the decision.
Appointment and close-out route
Responsibilities, delivery checks, specialist records and outstanding items organised through handover.
Discuss a scheme challenge

Questions

How many quotes should trustees obtain?

The useful number depends on the work, scope, urgency and procurement route. The key requirement is a fair comparison of defined options, not a fixed count of unlike quotes. Ask providers to identify assumptions before the scheme selects a route.

Should the cheapest quote win?

No. Compare the complete scope, exclusions, capability, programme, quality checks and handover before weighing price. A cheap quote can leave access, testing or reinstatement outside the job. Put every exclusion beside the price so the practical gap is visible.

What if providers propose different solutions?

Record the difference and decide whether the scheme needs a technical assessment before choosing. Do not force unlike methods into one price column without explaining the consequences. Keep clarifications with the final comparison and appointment.