Utilities, metering and energy · 5 min read
What questions help a scheme assess solar feasibility?
Solar feasibility begins with the building, loads, roof, electrical system, approvals, maintenance and use case, not a panel count.

In short
A scheme should ask about roof condition and remaining service, usable area, shading, orientation, structural capacity, load profile, electrical connection, storage, safety, approvals, maintenance and handover. Solar feasibility is a site and operating assessment, not a promise of savings. The scope should state what evidence the study will produce.
Key takeaways
- Check the roof and electrical system before discussing panel capacity.
- Match solar generation and storage to the scheme's actual load profile.
- Require assumptions, maintenance duties, safety controls and records in the feasibility output.
A solar feasibility review should answer whether a scheme can install and operate a system safely and sensibly. It should examine roof condition, shade, orientation, structure, electrical infrastructure, common-area loads, storage, access, approvals and maintenance. Dev 360 One can clarify the questions and coordinate qualified capability. The scheme decides whether to proceed; no savings outcome should be assumed.
Start with the roof and site
Ask for roof age, condition, waterproofing history, access, shade, orientation, usable area and future repair plans. Installing on a roof that needs replacement can create a sequencing and warranty problem. The survey should show exclusions, obstructions, walkways and maintenance access.
A roof divided by plant, parapets and shade may have far less usable area than a plan suggests. Ask the provider to show the assumptions on a marked-up layout rather than presenting a panel count without context.
Ask whether roof repairs, waterproofing or future access will require equipment removal or relocation. A feasibility report that ignores the roof's next maintenance cycle can create a later capital problem.
Ask who owns monitoring data and who can authorise a shutdown during maintenance or a fault.
Understand the load profile
List common-area loads by time: pumps, lifts, lighting, gates, security, plant, offices and other shared services. Ask for historic electricity accounts and, where needed, interval data. Solar output and battery value depend on when energy is produced and consumed, not only annual totals.
If most use occurs after sunset, storage or load shifting may affect the assessment. If pumps run during daylight, direct use may be more relevant. The report should state the data period and assumptions used.
Separate a feasibility forecast from a design. The scheme may need a later detailed electrical, structural or installation scope before procurement. State what the first report does and does not establish.
Check electrical and structural interfaces
Have a qualified specialist check whether the main board, protection, cabling, metering and connection can accommodate the system. Confirm structural assessment, wind loading, waterproofing, fire access and isolation requirements. These are specialist questions, not details to infer from a sales presentation.
Require a site plan showing equipment, cable routes, isolators, inverter or battery location and access. The scheme should understand what common areas are occupied and what must remain clear for maintenance or emergency response.
Check how generation, storage, common loads and any export or allocation arrangement are measured. The scheme needs a record that can be compared with the original assumptions without relying on a sales dashboard.
Ask the assessor to identify what would stop a later design, such as a roof requiring repair, insufficient electrical capacity, an access conflict or an approval still needed. Separate those prerequisites from optional features. A comparison of solar-only, storage, staged work and no-build can then use the same load data and responsibility assumptions, rather than comparing one detailed proposal with an untested alternative.
Question storage, operation and records
If batteries are proposed, ask about location, ventilation, protection, controls, isolation, fire response, replacement assumptions and maintenance. For any system, require commissioning, monitoring, warranties, product information, operating instructions and an asset schedule.
Ask who reviews alerts, arranges service and authorises shutdown. A system can produce data without producing good decisions if nobody owns the operating routine.
Ask for a maintenance and fault response route. Panels, inverters, batteries, isolators and monitoring equipment each introduce an asset and a responsibility. Put those assets into the scheme register before approval.
A feasibility brief should distinguish an initial screening from later design and procurement. Ask which specialist will check roof condition, structural loading, electrical capacity and connection requirements, and what output each assessment provides. Record any assumption about equipment location, access or future roof work. If the evidence is insufficient, the report should identify the next investigation rather than implying installation is ready.
Ask for the load data period and whether it reflects ordinary use, vacancies, outages or unusual operation. A simple annual total may hide when common loads occur, while interval data may need checking against meter identity and billing dates. The assessor should state how shading, system performance, maintenance and any export arrangement affect the scenario, without presenting a forecast as a guaranteed bill reduction.
Also decide who will maintain the system, review alerts, arrange a service visit and keep commissioning records. Include the process for isolating equipment during roof maintenance and for responding to a fault. Trustees should be able to see the responsibilities and ongoing costs before choosing whether to proceed, stage further work or decline the proposal.
Assemble the feasibility file
Collect twelve months of electricity accounts, roof reports, plans, photographs, equipment schedules and known maintenance dates. Add a list of common-area loads and outage concerns. Give the file to a qualified assessor and ask for assumptions and missing evidence in the report.
- Confirm roof condition and usable area.
- Provide load-profile and electrical/structural evidence.
- List approvals, safety, access and maintenance needs.
- State assumptions and evidence gaps.
- Treat savings as a scenario, not a promise.
What you get
What you get from Dev 360 One
- A feasibility question set
- Roof, load, structure, electrical, storage, safety, approval and maintenance questions defined for assessment.
- A site evidence file
- Accounts, plans, photographs, roof condition, equipment and maintenance records gathered for the assessor.
- An options brief
- Solar, storage, staging and no-build routes compared against actual scheme requirements and constraints.
- A decision record
- Assumptions, evidence gaps, risks, scope, handover and next approval arranged for trustees.
Questions
Can solar be installed on any scheme roof?
No. Roof condition, structure, shade, access, waterproofing, electrical connection and safety requirements must be assessed. A technically suitable roof may still need repair or a different layout before installation. Ask for a site-specific feasibility output.
Does solar guarantee lower bills?
No. Generation, use, tariffs, maintenance, equipment performance, storage and operating conditions affect outcomes. Treat any forecast as an assumption-based scenario and ask what evidence supports it. Dev 360 does not guarantee savings.
Should batteries always be included?
No. Batteries should be assessed against load timing, outage needs, location, safety, replacement and maintenance. A scheme may choose solar-only, storage, staged work or no project after comparing the evidence and operating responsibilities.
Keep reading
