AI, data and technology · 5 min read
What should a scheme ask about system integrations?
Before connecting systems, a scheme should know which record is authoritative, what data moves, who can see it and how failures are found and corrected.

In short
A scheme should ask which system is authoritative, which fields move, how permissions apply, what happens when records conflict, who monitors failures and how the connection is stopped. Test a small sample first, preserve the source records and keep a human review for consequential actions.
Key takeaways
- Name the authoritative record before connecting any scheme systems.
- Treat every data connection as a new operational responsibility.
- Test conflicts, failures and exit before scaling a connection.
An integration joins processes, not just screens. It can save retyping, but it can also copy an error into several places or expose a record to users who should not see it. Trustees and managing agents should ask operational questions before approving a connection. The technical specialist can explain the implementation; the scheme still decides whether the arrangement fits its needs.
Decide what is authoritative
Suppose a managing agent keeps owner contact details in one system and a maintenance tool asks for its own copy. Which record controls a change? If nobody can answer, the connection will create disputes about which phone number or email address is current. Write one source of truth for each important field before mapping anything.
The answer may differ by field. A scheme decision belongs in the agreed record. A technical work status belongs in the specialist or project record. A dashboard can display both, but it should not silently overwrite one with the other.
- List each record type involved.
- Choose the authoritative source for each field.
- State whether the other system reads or writes.
- Define who approves changes to the source.
Map the data movement
Ask for a plain-language map showing what leaves each system, where it arrives, how often it moves and what triggers the transfer. Include attachments, comments, dates, user identity and deletion or correction requests. “The systems integrate” is not a sufficient description for a decision paper.
For a maintenance request, the visible status may be copied while the original photograph, approval note or supplier document remains behind. That can create a misleading summary. The map should show what context travels and what a user must still find in the source record.
- Name fields and attachments, not just applications.
- Show direction, timing and trigger for each transfer.
- Identify data that does not move.
- Record what happens when a field is blank.
Plan for conflict and failure
Every connection needs an exception route. Ask what happens when a record is duplicated, a transfer fails, a user lacks permission or two systems contain different dates. The scheme should know how the error appears, who sees it and who can correct it without creating another duplicate.
Run a controlled test with an intentionally incomplete record and a changed field. Keep the result. A successful test is not only a record appearing in the destination. It is a known, traceable response when the connection cannot complete its work.
- Test a missing field and a duplicate.
- Check how an error is reported.
- Name the person who investigates the exception.
- Record the correction in the source system.
Limit permissions and change risk
An integration can widen access without anyone intending it. Ask whether the connection uses a service identity, individual users or another arrangement, and what each can read or change. Review access when roles change. A technical provider should document its responsibility, but the scheme needs a practical review owner.
Changes to one system can alter the connection. Ask how updates are tested, communicated and reversed. A small change to a category or field may break a report that trustees rely on. Include change control in the support discussion.
- Use the least access needed for the stated purpose.
- Review users and service access after role changes.
- Ask how system updates are tested.
- Keep a rollback or disable route.
Make support and exit explicit
Ask who monitors the connection, how support is requested, what counts as urgent and how long records remain available during a dispute. Then ask how the scheme can disable the connection and retrieve its records if the arrangement ends. The answers belong in written terms and handover notes.
A connection should not become the only place where a critical history exists. Preserve source records and agree how the scheme identifies changes made through the connection. A tidy exit is part of responsible design, not an unfriendly assumption.
An integration is only observable if a person can see that it failed. Ask whether the system raises an exception, where it appears, how it is assigned and what evidence shows that the correction reached the destination. A silent failure is a governance problem as well as a technical problem.
For a report used at a trustee meeting, check whether a delayed transfer is labelled as current. The meeting should be able to tell the difference between a fresh source value and an old copied value.
Record why each connection exists, what it exchanges, who supports it and when it was last checked. A connection forgotten after a staff change can continue moving records without anyone reviewing its purpose.
The register should include a disable instruction that a responsible user understands. A connection that cannot be paused safely is a dependency to discuss before it becomes part of a critical process.
- Name support and escalation contacts.
- Document monitoring and incident evidence.
- Confirm disable, export and access-closure steps.
- Test the exit route on a small sample.
Your first check, draw one data path
Take a single maintenance request and draw five boxes from receipt to trustee report. Mark every place the information is copied, every person who approves a change and every attachment that could be lost. Ask the integration specialist to explain the highest-risk handoff.
What you get
What you get from Dev 360 One
- An integration question set
- Plain-language questions covering source of truth, fields, attachments, permissions, errors, support, changes and termination.
- A data-flow sketch
- A scheme-specific map showing what moves between systems, what remains in the source and who reviews exceptions.
- A controlled test plan
- Small tests for missing fields, duplicates, changed values, permissions, failure reporting and export.
Questions
What is the first integration question?
The first integration question is which system is authoritative for each record or field. Without that answer, a connection can duplicate or overwrite information without a clear correction route. Map the source, destination, direction and human owner before discussing technical configuration.
Can two scheme systems both be the source of truth?
They can be authoritative for different records, but one field should not have two unexplained sources. Write the boundary clearly. A dashboard may display information from both systems while preserving which source controls each value.
How should an integration be tested?
Test a small representative sample, including a missing field, duplicate, changed value and permission boundary. Confirm how failures appear, who corrects them and whether attachments and decision context remain available. Keep the test evidence with the scheme’s technology record.