Scheme assessment and intervention · 5 min read
How do trustees and agents confirm who can decide?
Confirm the scheme, decision-makers and appointment route before a technical question becomes an unauthorised instruction.

In short
Trustees and managing agents confirm authority by naming the scheme, the management role, the people authorised to decide, the appointment route and the approval record. Check current minutes, the management agreement and relevant resolutions. Do not assume that the person reporting a defect can appoint the specialist who investigates it.
Key takeaways
- Authority belongs in the first brief, not at the bottom of a supplier email.
- Separate requesting information, approving work, appointing capability and paying invoices.
- A clear route protects trustees, agents and specialists from avoidable confusion.
A scheme can have excellent technical information and still fail to act because nobody has confirmed who may decide. The managing agent may receive the complaint, a trustee may request a quote and the body corporate may need to approve the appointment. Those are different roles. Write them down before a specialist visits site or prepares a price.
Imagine a scheme with an intercom failure. A resident reports the fault to the managing agent. A trustee asks a supplier to inspect. The supplier sends a replacement quote to the trustee. Before comparing equipment, the scheme should confirm whether the trustee requested information, authorised an inspection or made an appointment. A short authority check prevents an expensive argument later.
Separate four kinds of authority
The first distinction is between reporting, requesting, approving and appointing. Anyone may report a problem. A managing agent may request records or arrange access under its role. Trustees or another authorised body may approve the route. The scheme or its authorised representative may appoint and pay. The exact arrangement must be checked rather than guessed.
Add a fifth question: who accepts the handover? A technical provider may send a certificate to the site contact while the managing agent needs it in the scheme file. If the receiving person is not named, a completed job can remain administratively open.
- Who reported the issue?
- Who can request an assessment?
- Who approves a specialist appointment?
- Who authorises payment?
- Who receives the completed record?
Read the current record
Start with the latest trustee and AGM minutes, the management agreement, previous resolutions, procurement records and correspondence that describes the issue. Look for limits, delegated responsibilities, deferred decisions and named representatives. An old instruction may explain why a supplier was not appointed, but it may not authorise a new scope months later.
For trustees, bring the question to the next meeting in a form that can be minuted: the issue, the information sought, the proposed appointment route and the decision required. This creates a record that can be understood by the next committee.
Make urgency fit the route
Urgency can change the sequence without erasing authority. If a live electrical risk or active water ingress needs immediate protection, record the condition and the person who instructed the temporary action. Then identify the approval needed for investigation, permanent repair and reinstatement. Do not use urgency as a reason to leave the whole project undefined.
A useful instruction might be: arrange an urgent inspection of the affected distribution board, make the area safe if required, photograph the condition and report the findings before permanent work is approved. That is different from telling a supplier to replace everything without an assessment.
If the latest minutes approve an investigation but do not approve replacement, preserve that distinction in the brief. The specialist may inspect and report, while a later trustee decision may be needed for equipment, labour or reinstatement. This prevents a technical recommendation from being mistaken for authority to spend. It also gives the managing agent a clean answer when an owner asks why the inspection happened but the permanent repair has not yet been instructed.
Write the appointment boundary
The written scope should state whether the provider is assessing, designing, repairing, certifying, coordinating or supplying. It should name the site or units, required access, outputs, exclusions and escalation point. If a specialist finds a wider issue, the scope should say who pauses work, who reports the finding and who authorises the next package.
The appointment boundary also matters to the technical provider. Specialists remain responsible for their own technical findings, work, certificates and warranties. Dev 360 One can coordinate the route, but coordination does not transfer the specialist's technical accountability to the scheme, agent or coordinator.
Keep the agent's relationship intact
The agency continues to hold the client relationship and scheme administration. That does not prevent Dev 360 One from adding delivery capacity. It means the communication route should be agreed rather than improvised. Decide who receives updates, who answers owner questions, who handles access and which matters require trustee approval.
A portfolio manager may need a single progress note while a specialist needs direct access to a unit. Both can work if the scope states the route. The agent should not learn about a material change from a supplier invoice, and the trustee body should not receive competing versions of the decision.
The authority review can produce an authority map, decision brief and appointment route before an assessment begins. We can also coordinate the written scope and the next capability. The scheme remains responsible for its governance and appointment decisions; technical providers remain responsible for their own technical outputs.
- Authority and role map
- Current-record review
- Appointment boundary
- Approval note
- Named handover recipient
This week, open the latest minutes and write five names or roles beside reporting, requesting, approving, appointing and receiving the record. If any line is blank, make that the next trustee or agent question. A blank authority field is a useful warning before work is commissioned.
What you get
What you get from Dev 360 One
- Authority map
- The scheme, agent, decision-makers, appointment route and handover recipient arranged in one note.
- Appointment boundary
- A written distinction between assessment, repair, coordination, certification and supply responsibilities.
- Decision record
- The approval needed, chosen route and unresolved authority questions ready for the scheme file.
Questions
Can one trustee appoint a specialist?
That depends on the scheme's authority and any delegation recorded in its current arrangements. Do not infer authority from urgency or familiarity with a supplier. Check the applicable record and minute the route used.
What if the managing agent arranged the inspection?
The agent can explain its role and the basis for arranging it. The scheme should still know what was requested, who approved any cost and what later work would require separate approval.
Who signs the handover?
Name the person or role responsible for receiving the report, certificates, warranties and open items. The technical provider remains responsible for its own documents, while the scheme or agent keeps the administration record.
Keep reading
