How should a scheme compare assessment proposals?

Compare the question, method, access, output and responsibility before treating different assessment scopes as competing prices.

A geyser in a roof space with a new drip tray and a technician's clipboard

Key takeaways

  • Compare outputs and boundaries before comparing totals, then record the selection with trustees.
  • A proposal that cannot answer the scheme question is not a useful bargain.
  • Record why the chosen option fits the evidence and consequence.

Assessment proposals are difficult to compare when the brief is vague. One provider may price a visual inspection, another may include testing, and a third may include a report with recommendations. All three can use the word assessment while offering different evidence and responsibility.

Write the common question first. Then place every response beside the same headings: area, method, access, output, exclusions, timing, assumptions, technical responsibility and handover. The scheme can choose a narrower route, but it should know what it is buying and what remains unanswered.

Start with a comparison brief

The comparison brief should describe the problem, location, history, evidence available, decision required and output expected. If the question is recurring water ingress, state which areas should be considered, whether prior work must be reviewed, what photographs are required and what recommendation the report must make.

Without a shared brief, the provider who writes the broadest description may appear to offer the most value. The provider who writes the shortest may look cheapest. Neither impression is reliable until scope and deliverable are set beside each other.

Compare the technical question

Ask what each option is designed to establish. A visual inspection may identify visible condition. Moisture testing may test distribution. A meter reconciliation may compare accounts and readings. A specialist report may recommend a repair route. These are different purposes, and the scheme may need one before another.

Consider a cracked walkway: one proposal may inspect the surface, another may assess drainage and movement, and a third may include a repair design. Put the question and method in separate columns. Trustees can then decide whether the immediate need is diagnosis, design or repair.

Read access assumptions

Access can change both price and conclusion. Does the proposal assume one unit, every unit, roof access, opening-up, testing of adjacent areas or access to a locked meter room? Does the scheme arrange notices and keys, or does the provider include that work? Are return visits included if the first appointment cannot inspect a relevant location?

A proposal that excludes access may still be suitable, but the exclusion must be visible. A water assessment that cannot enter the unit above the stain may leave the source unresolved. Put the no-access consequence beside the option, not in a footnote nobody reads.

Compare the output

A report title is not an output. Ask for the content: findings, photographs, test results, marked locations, limitations, likely causes, priority, recommended next scope and handover documents. If the scheme needs a decision between repair and replacement, require the evidence and assumptions behind that recommendation.

An option that provides only verbal feedback may suit a small low-consequence question, but it is not equivalent to a report that future trustees can read. Choose deliberately and record why the output fits the decision.

Check exclusions and interfaces

Read what is not included. Common exclusions include opening-up, reinstatement, specialist testing, after-hours attendance, access coordination, design, certificates and permanent repair. None is automatically unreasonable. The issue is whether the excluded work is essential to the question.

Also check interfaces. If the assessment identifies a leaking pipe, who prepares the repair scope? If a report recommends replacement, who compares suppliers? If a defect affects a neighbouring unit, who arranges access? The proposal should state where its responsibility ends and the next route begins.

Assess responsibility and independence

The scheme should know who stands behind the technical findings and what certificates or warranties apply. An assessor may recommend work that it can also supply; that can be acceptable if the scope, evidence and commercial route are transparent. The scheme should still compare the recommendation with the question it appointed the provider to answer.

Dev 360 One can coordinate options and make roles visible. It does not take technical responsibility away from the appointed specialist. Trustees and managing agents should record which party performs, certifies, warranties and hands over each output.

Put the choice on one sheet

Create a table with columns for provider, question answered, area, method, access assumption, report, exclusions, timing, technical responsibility, handover and commercial terms. Add a final column: unresolved after this assessment. That column prevents the scheme from mistaking a broad recommendation for a complete answer.

The chosen option should have a recorded reason. It may be the only one that accesses the relevant area, the only one that produces a required test, or the proportionate route for a low-consequence issue. The reason is part of a defensible decision.

A proposal comparison can provide a shared assessment brief, comparison table, question list and recommendation record. We can help clarify exclusions and coordinate the chosen route. The scheme decides and appoints, while each specialist remains responsible for its own technical service and documents.

Compare two assessment scopes and two assessment proposals this week. Highlight the question, area, method, access, output and exclusions in different colours. If any heading cannot be filled for both, the options are not yet comparable. Ask for clarification before asking trustees to choose.

What you get

What you get from Dev 360 One

Common brief
One assessment question and output against which different providers can respond.
Comparison sheet
Method, access, deliverable, exclusions, responsibility and handover set beside each other.
Selection record
The practical reason for the chosen route and the uncertainty that remains.
Discuss a scheme challenge

Questions

Should the cheapest assessment win?

Not automatically. First establish whether each option answers the same question and includes comparable access, method, output and handover. A cheaper narrow inspection may be suitable, but only if the scheme understands what it will not establish.

Can trustees ask a provider to clarify its proposal?

Yes. Clarify method, areas, exclusions, assumptions, deliverables, access and technical responsibility before comparing. Keep the questions and answers with the selection record so the final decision reflects the clarified scope.

What if proposals recommend different causes?

Record the difference and compare the evidence each recommendation relies on. The scheme may need a targeted review to resolve the disagreement before choosing permanent work. Do not select a cause because it appears in the longest proposal.

More on scheme assessment and intervention

Want to apply this to your situation?

Send us a few lines. A person at Dev 360 will reply.