How should a scheme set access permissions for records?

Access permissions should follow the task, scheme and sensitivity of the record. Start with roles and real workflows, then review inherited access and exports.

A managing agent's desk with files, a laptop and a cup of tea by a window

Key takeaways

  • Grant access by role and task, including controls for downloads, shared links and exports.
  • Review access after role changes and test both access protection and routine retrieval.
  • Record temporary access with an end date or review owner.

Access permissions are working controls, not a once-off technology setting. A scheme should decide who may view, add, change, approve or export each record group, and how access is removed when a role changes. The managing agent can administer the routine, but trustees should understand the boundaries around their scheme’s records.

Map roles to actions

List the roles that touch records: trustee, managing-agent administrator, portfolio manager, contractor, specialist, auditor or temporary reviewer. For each record group, define view, add, edit, approve and export needs. Avoid the shortcut of giving everyone edit access because it is easier to configure.

A contractor may need a job brief and site contact for one works package. That does not require access to levy statements or owner correspondence. A trustee may need to read a report and resolution history without changing the underlying ledger.

Build permissions around the repository

Check the actual places where information lives: the agent’s system, shared drives, email groups, meeting packs, contractor links and downloaded spreadsheets. Permissions in one system do not protect copies elsewhere. Label controlled attachments and define where the current record resides.

A report may be correct in the live repository yet become risky when emailed to a broad list with an unrestricted download link. A short distribution check before each meeting pack can prevent accidental oversharing without slowing routine work.

Review changes and temporary access

Record who granted access, for what purpose and until when. Temporary access should have an end date or a named review. When a trustee rotates, an employee leaves, or a contractor finishes, remove or amend permissions promptly and record the check.

Do not share passwords to solve a handover problem. Create the right account or route through the repository owner. The access log should tell a future reviewer what changed without exposing credentials.

Test retrieval and editing

Permission design can fail in two ways: people see too much, or the right person cannot complete a basic task. Test both. Ask a trustee to locate a resolution, an administrator to update a sample owner change, and a contractor to open only the job material intended for it. Record the result and any workaround.

If staff routinely download a full register because the system is too slow or restrictive, the practical control is already failing. Fix the workflow rather than blaming the user for creating a second uncontrolled copy.

Review one report distribution this week

Permissions should be reviewed after a portfolio transfer, trustee change, system migration, contractor appointment and major project close-out. These are the moments when inherited access and old links accumulate. Keep a simple review record with date, scope, reviewer and exceptions. A permission that nobody can explain should not become permanent by inertia.

Consider the difference between viewing a document and exporting it. A trustee may need to read a report, while an administrator may need to edit a register. A contractor may need a time-limited download. Making those actions explicit produces better controls than one broad folder permission.

Before changing a permission, ask the person doing the work what they actually need to view, edit or export. Compare that answer with the current role setting and the copies already circulating. The gap between formal access and real work is where many practical controls fail.

Use a permission role map that distinguishes scheme scope from portfolio scope. A staff member may work across several schemes but still need separate access to each record group. Scope errors are easy to miss when a broad portfolio folder is treated as the natural home for everything.

Log access exceptions with an expiry or review date. A temporary project link should not become a permanent shortcut. When a contractor’s work ends, check both live permissions and links already shared through the project file.

A permissions review should include ordinary user behaviour. If people must export a full register to complete a small task, the formal permission model is not enough. Ask what workarounds are common, then redesign the access route or report. Good controls make the safe action the easy action and record exceptions rather than pretending they do not occur.

Ask the repository owner whether permission changes apply to old links and downloaded files. They may not. A review should therefore include practical communication rules, such as replacing an unrestricted link and telling recipients which version is current. Access control is partly technical and partly a habit of sending the right record to the right audience.

This week, prepare the next report pack as an access test. List each recipient, attachment and required action, then check whether each person can do the task without seeing unrelated information. Ask one pack preparer to describe a common workaround and redesign that route rather than accepting an uncontrolled export.

What you get

What you get from Dev 360 One

A role and record-group permission role map
Map view, edit, approval and export rights by role and record group.
A shared-copy and export review
Review shared copies and permissions after joiner, mover and leaver events.
An access change and sample-task test
Test that authorised users can retrieve records without seeing unrelated information.
Discuss a scheme challenge

Questions

Who should manage scheme record permissions?

The managing agent normally administers day-to-day permissions, with scheme authority and agreed controls guiding access to trustee records. Technical owners may configure repositories, but no system setting replaces a clear role, purpose and removal process.

Should trustees all have edit access?

Trustees do not automatically need edit access to every record. Give them the ability to review and instruct through the agreed process, while limiting changes to people responsible for maintaining the live record and preserving its history.

Why are downloaded spreadsheets a risk?

A downloaded spreadsheet can outlive the permission that protected the original record and may be forwarded without context. Control exports, label sensitive schedules and keep the current version in the agreed repository.

More on managing-agent records and reporting

Want to apply this to your situation?

Send us a few lines. A person at Dev 360 will reply.